Post Excavation Procedures


Post Excavation Procedures:

 Antitermite Treatment to sides of excavated pits:


1) Antitermite treatment solution shall be prepared on site by mixing solution mentioned.

2) Antitermite treatment in foundation shall start after site Engineer gives his permission to do so. Treatment shall be complete with treatment of soil underneath the foundation as well as to the sides of the excavated pits to form a total barrier between foundation and excavated pits.



3) It shall be ensured that soil surface to be treated is dry before the start of application of treatment. In no case treatment shall be given during raining. Or when the soil is wet or sub-soil water level is high.


4) Solution shall be sprayed on bottom of pits as also on sides of pits up to a height of 300 mm above concrete foundation level shall be treated.


5) Solution shall be allowed to get absorbed in the soil and concreting shall not be allowed unless the treated surface of soil is dry. 