Step 2 – Site Preparation
Dewatering of area to be concreted shall be carried out if required. Also area shall be cleaned of any dirt,
debris, waste material, binding wires etc.
Step 3 – Pre Concreting Checks
-
15) All other requirements pertaining to Materials, Storage of Ingredients, production, delivery, batching
equipments, quality control, sampling, order processing etc. as specified in IS 4926:2003 – “READY-
MIXED CONCRETE-CODE OF PRACTICE” shall be binding on the producer / supplier of concrete.