C) Storage of Raw Material
a) Soil for backfilling:
1) Excavated materials which in the opinion of Site Engineer are useful shall be stacked in regular heaps, bunds with regular slopes. Such stacking shall be done within the lead (50 m or as specified).
2) Stacks of soil shall be properly leveled for providing natural drainage.
1) Excavated materials which in the opinion of Site Engineer are useful shall be stacked in regular heaps, bunds with regular slopes. Such stacking shall be done within the lead (50 m or as specified).
2) Stacks of soil shall be properly leveled for providing natural drainage.
