Showing posts with label california bearing ratio. Show all posts
Showing posts with label california bearing ratio. Show all posts

(part 2) procedure for EXCAVATION & BACKFILLING

shoring & strutting

Excavation:

1) It shall be ensured that all necessary equipments, tools, instruments, material and consumables including temporary facilities like platform, walkways etc. as mentioned are available at site.

2) All skilled / unskilled manpower along with supervisory personnel for carrying out work shall have sufficient experience on similar works.

Guidelines for Inspection of Backfill Material

Even though hard murum is to be used as a back fill soil ideally, it should meet the following