Post Excavation Procedures
Post Excavation Procedures:
Antitermite Treatment to sides of excavated pits:
Antitermite Treatment to sides of excavated pits:
1) Antitermite treatment solution shall be prepared on site by mixing solution mentioned.
2) Antitermite treatment in foundation shall start after site Engineer gives his permission to do so. Treatment shall be complete with treatment of soil underneath the foundation as well as to the sides of the excavated pits to form a total barrier between foundation and excavated pits.
2) Antitermite treatment in foundation shall start after site Engineer gives his permission to do so. Treatment shall be complete with treatment of soil underneath the foundation as well as to the sides of the excavated pits to form a total barrier between foundation and excavated pits.
(part 2) procedure for EXCAVATION & BACKFILLING
| shoring & strutting |
Excavation:
1) It shall be ensured that all necessary equipments, tools, instruments, material and consumables including temporary facilities like platform, walkways etc. as mentioned are available at site.
2) All skilled / unskilled manpower along with supervisory personnel for carrying out work shall have sufficient experience on similar works.
1) It shall be ensured that all necessary equipments, tools, instruments, material and consumables including temporary facilities like platform, walkways etc. as mentioned are available at site.
2) All skilled / unskilled manpower along with supervisory personnel for carrying out work shall have sufficient experience on similar works.
Guidelines for Inspection of Backfill Material
Even though hard murum is to be used as a back fill soil ideally, it should meet the following