Procedures for Excavation and backfilling works including Antitermite Treatment
Pre Excavation Procedures:
Setting out:
1) It shall be ensured that drawing indicating setting out points is available on site. Also necessary surveying equipment as mentioned shall be available on site in good operational condition.
Setting out:
1) It shall be ensured that drawing indicating setting out points is available on site. Also necessary surveying equipment as mentioned shall be available on site in good operational condition.