RCC (part 4) - Ready Mix Concrete


  1. 15)  All other requirements pertaining to Materials, Storage of Ingredients, production, delivery, batching equipments, quality control, sampling, order processing etc. as specified in IS 4926:2003 – “READY- MIXED CONCRETE-CODE OF PRACTICE” shall be binding on the producer / supplier of concrete.

RMC (part4) - Ready Mix Concrete


On site the following information will be added:
  1. (a)  Time of arrival on site.
  2. (b)  Time when discharge was completed.
  3. (c)  Any water / admixture added by the supplier to meet the specified workability.
  4. (d)  Any extra water or admixture added at the request of representative and his

RCC (part3 )- Ready Mix Concrete


slab pour self compacting concrete
Site representative with a preprinted delivery ticket for each delivery of concrete on which is printed, stamped or written the minimum information detailed below. The delivery ticket will form the basis of invoicing. The following information shall be included in the delivery ticket to accompany the load to engg