Showing posts with label scc. Show all posts
Showing posts with label scc. Show all posts
RMC (part4) - Ready Mix Concrete
On site the following information will be added:
-
(a) Time of arrival on site.
-
(b) Time when discharge was completed.
-
(c) Any water / admixture added by the supplier to meet the specified workability.
- (d) Any extra water or admixture added at the request of representative and his
RCC (part3 )- Ready Mix Concrete
![]() |
| slab pour self compacting concrete |
Subscribe to:
Posts (Atom)
