During Excavation Procedures:
1) The excavation shall be done to correct lines, dimensions and levels as per drawing. Adequate side slopes
shall be maintained during excavation of loose soil to prevent soil from sides of excavated pits from falling
back into the pits.
2) Wherever required, proper shoring and strutting shall be provided to maintain and prevent sides of excavations from collapsing.
3) No heavy equipment shall be allowed within 6m from edge of excavation or within a distance equal to depth of excavation, whichever is less.
2) Wherever required, proper shoring and strutting shall be provided to maintain and prevent sides of excavations from collapsing.
3) No heavy equipment shall be allowed within 6m from edge of excavation or within a distance equal to depth of excavation, whichever is less.